Georgia DOT Bridge Pile Jacketing
Owner: Georgia DOT | GC: Massana Construction | Georgia | 2024
The problem
The bridge piles had section loss and spalling.
What made it hard
The piles and jackets were very large. The work took place in cold and freezing weather, and access was difficult.

What Zion Marine did
We prepared the piles underwater and installed 148 linear feet of integral jackets, 34 to 60 inches, on SR 2 over West Chickamauga Creek and SR 52 over the Conasauga River. Grade level dredging and pumped fill were performed from floating platforms with surface supplied air. A five person crew, all divers, worked under one contract.


The result
The project was completed on time and to specification.

Bridge piles with section loss or spalling?
Tell us about the structure and conditions. We'll help assess the pile condition, jacket dimensions, access, and staging required for repair.