WaterLake Tuscaloosa Water Intake Upgrade
Owner: City of Tuscaloosa · GC: Haren Construction · Tuscaloosa, Alabama · 2024
Removed the existing timber intake and rock ballast and installed a new intake with diver-placed steel formwork, rebar and concrete. Replaced the screen guide rails and the air-valve intake. Surface-supplied air was run from a barge at 110 ft depth with surface oxygen decompression, an on-site chamber, a chamber operator and a dive medical technician on standby.







